The project has been approved according to Fanfa Gaiyuan [2014] No. 255, and it is currently being constructed by Guangzhou Panyu Communication Pipeline Construction Investment Co., Ltd. The project involves the construction of a 110 kV Guanqiao Power Transmission and Power Ditch Project. A public tender is being conducted for the general contracting of this project, with the selection of qualified contractors.
I. Project Name: General Contracting for the 110-kV Guanqiao Power Transmission and Power Ditch Project
IV. Project Overview: This project aims to renovate two 110 kV cable routes starting from the western side of the 110 kV Guanqiao Substation, running southward to Point A2 on Guokang Avenue. From there, the route continues along the southern side of Guokang Avenue and the auxiliary lane on the western side, heading northward to Point A12 on Lotus Road. The buried pipes (including jacking pipes and cable trenches) cross Lotus Road to Point A15 and extend further north toward a new cable terminal tower located on the northern side of the Guanqiao Gas Station. The total length of the line is 1.37 km, consisting of 756 meters of new cable trenches, 124 meters of 4C pipes, and 489 meters of 110 kV pipe jacks. Additional works include breaking and repairing 2,100 square meters of cement pavement, constructing 3 new cable connector wells, 6 cable accessory wells, 12 top tube wells, 6 ground network cables, 88 cable nameplates, 6 sets of cable sign posts, 5 warning tapes, and 4 warning signs. All details are based on the drawings, bill of quantities, and related project documents.
V. Tender Segment Division and Bidding Content, Scale, and Control Price for Each Segment:
1. The project is divided into one single tender segment.
2. Bidding Content, Scale, and Control Price for Each Segment:
(1) Item Number: JG2017-
(2) Bidding Content: The contractor is required to complete all construction works as outlined in the tender documents, project quantity list, tender and response documents, full set of construction drawings, design instructions, and supplementary explanations provided by the tendering entity. The contractor must carry out the work according to the requirements of the tendering unit, adapt to the actual site conditions, and cooperate with road construction arrangements. They will also be responsible for coordinating the power pipeline trenching project and assisting in the coordination of various construction activities. The contractor will manage the cross-construction of newly installed cables and optical cables and ensure proper coordination with other pipeline works. All risks associated with the tendering process shall be borne by the contractor.
(3) Tendering Scale: The project includes the renovation of two 110 kV cable routes from the west side of the Guanqiao Substation, extending southward to Point A2 on Guokang Avenue, crossing the avenue to Point A3, then continuing along the southern side of Guokang Avenue and the western auxiliary lane to Point A12 on Lotus Road. The buried pipes cross Lotus Road to Point A15 and proceed northward to a new cable terminal tower on the northern side of the Guanqiao Gas Station. The total line length is 1.37 km, including 756 m of new cable trenches, 124 m of 4C pipes, and 489 m of 110 kV pipe jacks. Additional works involve breaking and repairing 2,100 m² of cement pavement, installing 3 new cable connector wells, 6 cable accessory wells, 12 top tube wells, 6 ground network cables, 88 cable nameplates, 6 sets of cable sign posts, 5 warning tapes, and 4 warning signs.
(4) Bid Control Price: 108.9928996 million yuan.
Note: For projects involving two or more tender segments, the number of project leaders must be clearly defined if merging is allowed or not. For multi-specialty projects, the professional composition fees for each major should be clearly specified in relation to the bidding content, scale, and control price.
6. Source of Funds: Financial funds.
VII. Time for Issuing Tender Notices: From January 2017 to January 10, 2017.
Note: The time for issuing the tender notice starts from the date of publication and ends at the deadline for submitting tender documents.
VIII. Time for Submission of Tender Documents and Opening Time:
1. Submission Deadline: 00:00 on February 2017.
2. Bid Opening Time: 10:00 on March 2017.
This project represents a significant infrastructure development aimed at enhancing the power transmission capabilities in the area, ensuring reliable energy distribution and supporting future urban growth.
â—† UL&ENEC&CQC Safety Approvals
â—† Long life & high reliability
â—† Variety of Levers
â—† Wide Range of wiring Terminals
â—† Wide used in Automotive Electronics,Appliance and Industrial Control etc.
MT6-Subminiature Dustproof Micro Switch
Features
â—† Designed For Water and Dust Tight(IP67)
â—† Small Compact Sizeâ—† UL&ENEC&CQC Safety Approvals
â—† Long life & high reliability
â—† Variety of Levers
â—† Wide Range of wiring Terminals
â—† Wide used in Automotive Electronics,Appliance and Industrial Control etc.
â—† Customized Designs
Micro Magnetic Switch,Micro Momentary Switch,Sealed Rotary Switch,Subminiature Dustproof Micro Switch
Ningbo Jialin Electronics Co.,Ltd , https://www.donghai-switch.com